Construction within the SLZ

May 27, 2008

Here are some pictures of the construction work that has taken place within the new Social Learning Zone during May.

A crane was brought on site to lift into place new roof sections for the former Textile Hall.

Lifting new roof sections into place

The steel work that will support the mezzanine level is now in place. The mezzanine level will eventually house the new Eagle365 computer suite and the Students Union.

The mezzanine level looking up at what will be the Student Union

 The mezzanine level looking up at what will be the new Eagle365 suite

The image below shows the area that will eventually form the new entrance to the Library. This is where the Library Enquiry Desk and the Information Desk will be sited along with brand new self service facilities. The big hole that can see in the back wall, will be where the link corridor will be constructed to join the entrance area to the existing Library.

The Library entrance area

Advertisements

Comments Please!

May 21, 2008

This summer we intend to move the Textbooks so that they are shelved with the other copies of the same books.

Textbooks will still be for use in the Library only, so you should always be able to get hold of at least a reference copy.

*This will not apply to the Law Library Textbooks.

Any Comments?

Loan 20 books over the summer

May 1, 2008

Due to our library move over the summer you will be able to borrow a maximum of 20 books from Friday 23rd May to be returned by 3rd October.